P can complete a task in 10 days working 6 hours a day. Q can complete the same task in 9 days working 10 hours a day. If both P and Q work together working 6 hours a day, then in how many days can they complete the task?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (D) 6 days
Explanation
P requires a total of 10 × 6 = 60 hours to complete the task, while Q requires 9 × 10 = 90 hours.
Taking the total work as LCM(60, 90) = 180 units:
P's rate = 180 ÷ 60 = 3 units/hour
Q's rate = 180 ÷ 90 = 2 units/hour
Combined rate of P and Q = 3 + 2 = 5 units/hour.
Working together for 6 hours a day, they complete 5 × 6 = 30 units of work per day.
Time required to complete the task = 180 ÷ 30 = 6 days.
1252Mathematics
The interest on a sum of money at 10% p.a. for 2 years with interest being compounded annually is ₹630. Find the simple interest (in ₹) on the sum at the same rate of interest for 3 years.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (B) 900
Explanation
Effective compound interest rate for 2 years at 10% p.a. compounded annually = 10 + 10 + (10 × 10) / 100 = 21%.
Principal = (630 / 21) × 100 = ₹3000.
Simple interest for 3 years at 10% p.a. = (Principal × Rate × Time) / 100 = (3000 × 10 × 3) / 100 = ₹900.
1253Mathematics
Find the value of ((759 + 253)² + (759 - 253)²)/(759 × 759 + 253 × 253) :
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 2
Explanation
Using the algebraic identity (a + b)² + (a - b)² = 2(a² + b²), let a = 759 and b = 253.
Substituting these into the given expression:
[(759 + 253)² + (759 - 253)²] / (759 × 759 + 253 × 253) = 2(759² + 253²) / (759² + 253²) = 2
The terms in the numerator and denominator cancel out, leaving 2 as the result regardless of the specific values of a and b.
1254Mathematics
Pipes A and B are fitted to a tank. A is the filling pipe and B can be used for filling or emptying at the same rate. When B is used for filling, it takes time 't' along with A to fill the tank. If it is used for emptying when A is filling the tank, the time taken for the tank to fill up would be '5t'. Find the ratio of the rates of A and B.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 3:2
Explanation
Let the filling rates of pipes A and B be A and B units per hour respectively.
When pipe B is used to fill the tank alongside A, the combined filling rate is A + B, taking time t.
When pipe B is used to empty the tank while A fills it, the net filling rate is A - B, taking time 5t.
Since the volume of the tank is constant:
(A + B) × t = (A - B) × 5t
A + B = 5A - 5B
4A = 6B
A / B = 6 / 4 = 3 / 2
Thus, the ratio of the rates of A and B is 3:2.
1255Mathematics
The positive value of m for which the roots of the equation 12x² + mx + 6 = 0 are in the ratio of 2:3 is _____.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (B) 10√3
Explanation
For a quadratic equation ax² + bx + c = 0 whose roots are in the ratio p : q, the relation between the coefficients is given by:
b² / (a × c) = (p + q)² / (p × q)
From the given equation 12x² + mx + 6 = 0, the coefficients are a = 12, b = m, and c = 6, with p = 2 and q = 3.
Substituting these values into the formula:
m² / (12 × 6) = (2 + 3)² / (2 × 3)
m² / 72 = 25 / 6
m² = (25 × 72) / 6
m² = 300
m = √300 = 10√3
1256Mathematics
Solve the following:
1498 × 1498 = _____
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (B) 22,44,004
Explanation
Using the algebraic identity (a - b)² = a² - 2ab + b²:
Find the value of 515.86×515.86- 314.87×314.87 200.99
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (D) 830.73
Explanation
Using the algebraic identity a² - b² = (a + b)(a - b):
Let a = 515.86 and b = 314.87.
Notice that a - b = 515.86 - 314.87 = 200.99.
The given expression is (a² - b²) / 200.99 = (a² - b²) / (a - b).
Simplifying the expression:
(a² - b²) / (a - b) = (a + b)(a - b) / (a - b) = a + b
Substituting the values:
a + b = 515.86 + 314.87 = 830.73
1258Mathematics
AB and CD are two chords of a circle. AB = 6 cm , CD = 8 cm and AB ∥ CD . If the distance between AB and CD is 7 cm and the centre of the circle lies in the interior of the quadrilateral ABCD, then find the radius of the circle (in cm).
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 5
Explanation
Perpendicular from the centre of a circle to a chord bisects the chord. Half of chord AB is 3 cm and half of chord CD is 4 cm.
Let r be the radius of the circle, and let x and y be the perpendicular distances from centre O to chords AB and CD respectively. Since the centre lies in the interior of quadrilateral ABCD (between the two chords), the total distance between them is x + y = 7 cm.
Applying Pythagoras theorem to the right triangles formed by the radius, half-chord, and distance from the centre:
Solving the equations x + y = 7 and x - y = 1 gives x = 4 cm and y = 3 cm.
Substituting x = 4 back into the radius equation:
r² = 4² + 9 = 25
r = √25 = 5 cm
1259Mathematics
A, B and C together can complete a task in 16 days. After, three of them worked together for 2 days, A left. B and C continued for 9 more days and then B left. C completed the remaining work in 6 days. If C alone can complete the entire task in 24 days, then in how many days can B alone complete it?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 36 days
Explanation
Let the total work be 1 unit.
The combined daily work rate of A, B, and C is 1/16, and the daily work rate of C alone is 1/24.
Work completed by A, B, and C together in the first 2 days = 2 × (1/16) = 1/8 unit.
Remaining work = 1 - 1/8 = 7/8 unit.
Let b be the daily work rate of B. The remaining work is completed by B and C together for 9 days, followed by C alone for 6 days:
9(b + 1/24) + 6 × (1/24) = 7/8
9b + 15/24 = 7/8
9b + 5/8 = 7/8
9b = 2/8 = 1/4
b = 1/36
Since B completes 1/36 of the task per day, B alone can complete the entire task in 36 days.
1260Mathematics
The perimeters of two squares are 48 cm and 60 cm. Find the perimeter of a third square whose area is equal to the difference of the area of the squares.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 36 cm
Explanation
The side lengths of the two given squares are:
Side of first square = 48 / 4 = 12 cm
Side of second square = 60 / 4 = 15 cm
Their areas are:
Area of first square = 12² = 144 cm²
Area of second square = 15² = 225 cm²
Area of the third square = 225 - 144 = 81 cm²
Side of the third square = √81 = 9 cm
Perimeter of the third square = 4 × 9 = 36 cm
1261Mathematics
If x = 3 + √5 and y = 3 - √5 , then find the value of x² + y² .
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 28
Explanation
Using the algebraic identity x² + y² = (x + y)² - 2xy:
First, find the sum of x and y:
x + y = (3 + √5) + (3 - √5) = 6
Next, find the product of x and y using the difference of squares formula (a + b)(a - b) = a² - b²:
xy = (3 + √5)(3 - √5) = 3² - (√5)² = 9 - 5 = 4
AB is the diameter of a semicircle. C is a point on line AB, AC = 6 cm, D is the point on the semicircle such that CD is perpendicular to AB and CD = 9 cm. Find the diameter of the semicircle.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (D) 19.5 cm
Explanation
In a semicircle with diameter AB, angle ADB is 90°. Since CD is perpendicular to hypotenuse AB, by the right triangle altitude theorem, CD² = AC × CB.
Substituting the given values:
9² = 6 × CB
81 = 6 × CB
CB = 13.5 cm
The total diameter AB = AC + CB = 6 + 13.5 = 19.5 cm.
1263Mathematics
The sum of the prime numbers between the integer greater than 8 and less than 59 is
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 364
Explanation
The prime numbers strictly between 8 and 59 are 11, 13, 17, 19, 23, 29, 31, 37, 41, 43, 47, and 53.
Two concentric circles form a circular path. The inner and outer circumferences of the path are 56⁴⁄₇m and 94²⁄₇m respectively. Find the width of the path.
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (B) 6m
Explanation
The width of a circular path between two concentric circles is the difference between their outer and inner radii (w = R - r).
The difference between the outer and inner circumferences is given by:
C₂ - C₁ = 2πR - 2πr = 2π(R - r) = 2πw
Converting the mixed fractions into improper fractions:
Inner circumference C₁ = 56 4/7 = 396/7 m
Outer circumference C₂ = 94 2/7 = 660/7 m
Substituting the values into the formula:
660/7 - 396/7 = 2 × (22/7) × w
264/7 = (44/7) × w
w = 264 / 44 = 6 m
1269Mathematics
The given table provides the classification of employees in a private firm in the years 2000 and 2002.
Category of Employees Number in 2000 Number in 2002
Managers 19 19
Accountants 115 154
Programmers 134 173
Technicians 116 120
Analysts 32 133
Peons 96 149
Which category of employees among the given options have registered the highest percentage growth from 2000 to 2002?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) Accountants
Explanation
Percentage Growth = [(Value in 2002 - Value in 2000) / Value in 2000] × 100
For Accountants:
Increase in number = 154 - 115 = 39
Percentage Growth = (39 / 115) × 100 = 33.91%
Since both Accountants and Programmers saw the same absolute increase of 39 employees, Accountants achieved a higher percentage growth due to their lower base value in 2000 (115 compared to 134). This gives Accountants the highest percentage growth of 33.91% among the choices listed.
1270Mathematics
The given table provides the classification of employees in a private firm in the years 2000 and 2002.
Category of Employees Number in 2000 Number in 2002
Managers 19 19
Accountants 115 154
Programmers 134 173
Technicians 116 120
Analysts 32 133
Peons 96 149
Based on the data provided above, which of the following statements is TRUE?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (B) The number of Programmers, Technicians and Analysts together was more than 50% of the total employees in 2000.
Explanation
The total number of employees in the year 2000 is 19 + 115 + 134 + 116 + 32 + 96 = 512.
Half of the total employees in 2000 (50%) equals 512 / 2 = 256.
The sum of Programmers, Technicians, and Analysts in the year 2000 is 134 + 116 + 32 = 282.
Since 282 is greater than 256, the combined total of these three categories was indeed more than 50% of the total employees in 2000.
1271Mathematics
Study the given table and answer the question that follows.
Category of Employees Number in 2000 Number in 2002
Managers 19 19
Accountants 115 154
Programmers 134 173
Technicians 116 120
Analysts 32 133
Peons 96 149
What is the approximate percentage increase in total strength of all employees from 2000 to 2002?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 46%
Explanation
Total strength of employees in 2000 = 19 + 115 + 134 + 116 + 32 + 96 = 512.
Total strength of employees in 2002 = 19 + 154 + 173 + 120 + 133 + 149 = 748.
Study the given table and answer the question that follows.
Category of Employees Number in 2000 Number in 2002
Managers 19 19
Accountants 115 154
Programmers 134 173
Technicians 116 120
Analysts 32 133
Peons 96 149
What is the approximate difference in the percentage increase of Accountants and Technicians between 2000 to 2002?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 31%
Explanation
Percentage increase of Accountants from 2000 to 2002 = [(154 - 115) / 115] × 100 = (39 / 115) × 100 ≈ 33.91%
Percentage increase of Technicians from 2000 to 2002 = [(120 - 116) / 116] × 100 = (4 / 116) × 100 ≈ 3.45%
There are 20 pigeons, 10 cows, 15 dogs and some buffalos. If the total number of feet is 125 more than the heads, then what is the number of buffalos?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) 10
Explanation
Let b be the number of buffalos.
Total heads H = 20 + 10 + 15 + b = 45 + b
Pigeons have 2 feet each, whereas cows, dogs, and buffalos have 4 feet each.
Total feet F = (20 × 2) + (10 × 4) + (15 × 4) + (b × 4) = 140 + 4b
Given that the total number of feet is 125 more than the total heads:
F - H = 125
(140 + 4b) - (45 + b) = 125
95 + 3b = 125
3b = 30
b = 10
1275Mathematics
A line passes through two points (3,4) and (4,5). What is the angle of the slope of this line?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 45°
Explanation
The slope m of a line passing through two points (x₁, y₁) and (x₂, y₂) is given by:
m = (y₂ - y₁) / (x₂ - x₁)
Substituting (3, 4) and (4, 5):
m = (5 - 4) / (4 - 3) = 1
The angle of inclination θ of the line is related to its slope by:
m = tan θ
tan θ = 1
θ = 45°
1276Mathematics
What is the mean of the first five prime numbers?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 5.6
Explanation
The first five prime numbers are 2, 3, 5, 7, and 11.
Mean = (Sum of observations) / (Number of observations)
Mean = (2 + 3 + 5 + 7 + 11) / 5 = 28 / 5 = 5.6
1277Mathematics
What will be the compound interest on ₹1,000 at 20% per annum for 1 year compounded half-yearly?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) ₹210
Explanation
When interest is compounded half-yearly, the rate per period is halved and the number of periods is doubled:
Rate per half-year (r) = 20% / 2 = 10%
Number of compounding periods (n) = 1 × 2 = 2
Amount (A) = Principal × (1 + r/100)ⁿ
A = 1000 × (1 + 10/100)²
A = 1000 × (11/10)² = 1000 × 121/100 = ₹1,210
The difference between the compound and the simple interests on a certain sum of money for two years, at 5% per annum, is ₹1. The sum is:
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (C) ₹400
Explanation
For a period of two years, the difference (D) between compound interest and simple interest is given by the formula:
D = P × (R / 100)²
where P is the principal sum and R is the annual rate of interest.
Substituting D = 1 and R = 5 into the formula:
1 = P × (5 / 100)²
1 = P × (1 / 20)²
1 = P / 400
P = 400
1284Mathematics
A and B both working together can finish a task in 10 days. B and C both working together can finish the same task in 15 days. A and C both working together can finish the task in 20 days. In how many days can A, B and C working together finish this task?
● Correct
● Not quite — the correct answer is highlighted
Show answer & explanationHide answer⌄
Answer: (A) 9 3/13 days
Explanation
Let the total work be the LCM of 10, 15, and 20, which is 60 units.
Efficiency of A + B = 60 / 10 = 6 units/day
Efficiency of B + C = 60 / 15 = 4 units/day
Efficiency of A + C = 60 / 20 = 3 units/day
Adding these efficiencies gives 2 × (A + B + C) = 6 + 4 + 3 = 13 units/day.
Therefore, the combined efficiency of A, B, and C = 13 / 2 units/day.
Time required for A, B, and C working together = Total Work / Combined Efficiency = 60 ÷ (13 / 2) = 120 / 13 = 9 3/13 days.
1285Mathematics
A book is purchased for R1,000 and then sold for R1,200 . Find the gain percentage.
Next, evaluate the division inside the curly brackets:
45 ÷ 15 = 3
Then, perform the multiplication:
5 × ½ × 10 = 25
Finally, substitute these simplified values back into the main expression and perform addition and subtraction from left to right:
24 + 13 - 25 - 3 = 37 - 25 - 3 = 9