Answer: (C) 12
Explanation
A completes 25% or 1/4 of the work in 15 days. Thus, the total time required for A to finish the entire work is 15 × 4 = 60 days. His daily work rate is 1/60.
After A works for 15 days, he completes 25% of the work, leaving 75% or 3/4 of the work remaining. B completes this remaining 3/4 of the work in 30 days. Therefore, the total time B would take to complete the entire work alone is 30 × (4/3) = 40 days. His daily work rate is 1/40.
When A and B work together, their combined daily work rate is: 1/60 + 1/40 = (2 + 3) / 120 = 5/120 = 1/24
This means A and B together can finish the whole work in 24 days. To find the time required to finish 50% of the work, we calculate half of the total time: 24 × 0.5 = 12 days