Prime Minister Launches Multi Sector Projects in Rajasthan
Source:pmindia ↗

Why It Matters
Rajasthan-centric developmental projects like the Pachpadra Refinery joint venture, Jaipur Metro corridors, and regional solar parks are recurring areas of interest in RPSC RAS exams. Distinguishing between federal schemes (like the Modified aviation UDAN) and similarly named state schemes (like I Am Shakti Udan) is also crucial for competitive state examinations.
Summary
Prime Minister Narendra Modi's official visit on 4 July 2026 marks the dedication and launch of major infrastructure, energy, and transport projects in Rajasthan and Gujarat worth over Rs 1.06 lakh crore. Key highlights include India's first greenfield Refinery-cum-Petrochemical Complex at Pachpadra (Balotra), Jaipur Metro Phase 2, a major 1,300 MW solar capacity expansion in Bikaner, the launch of the Modified UDAN Scheme, and the inauguration of Gujarat's CG Semi OSAT semiconductor facility under the India Semiconductor Mission.
Key Points
- Prime Minister Narendra Modi dedicated and laid the foundation stones for development projects worth over Rs 1.06 lakh crore in Rajasthan and Gujarat.
- India's first greenfield integrated Refinery-cum-Petrochemical Complex at Pachpadra, Balotra, was dedicated. It is a joint venture of HPCL and the Government of Rajasthan (74:26 shareholding) built with an investment of over Rs 79,450 crore, featuring a 9 MMTPA capacity and a Nelson Complexity Index of 17.0.
- The foundation stone for Jaipur Metro Phase 2 was laid, spanning a 41 km north-south corridor from Prahladpura to Todi Mod at a cost of over Rs 13,000 crore.
- Major solar energy projects dedicated in Bikaner: SJVN's 1,000 MW Bikaner Solar Energy Project (investment Rs 5,500 crore) and NHPC's 300 MW Karnisar Bikaner Solar Energy Plant. Additionally, power evacuation transmission systems for the Rajasthan Renewable Energy Zone (REZ) were launched.
- The central government launched the 'Modified UDAN Scheme' with a 10-year allocation of Rs 28,840 crore to develop 100 aerodromes and 200 modern helipads, supporting indigenous aircraft like HAL Dhruv and Dornier. Jodhpur Airport's New Terminal Building (Rs 480 crore, 5-Star GRIHA rating) was inaugurated.
- In Sanand, Gujarat, the CG Semi Outsourced Semiconductor Assembly and Test (OSAT) facility was inaugurated—one of the first four approved under the India Semiconductor Mission, with an investment of over Rs 7,500 crore.
Important Terms
Modified UDAN Scheme
A revamped version of India's flagship regional connectivity scheme, approved in 2026 for a 10-year period (FY 2026-27 to 2035-36) with a ₹28,840 crore outlay to expand affordable regional air travel.
UPSC context
GS Paper 3: Infrastructure (Aviation). Tests understanding of regional connectivity, exchequer-funded viability gap funding, and sustainable transport models.
India Semiconductor Mission (ISM)
A specialized division within the Digital India Corporation under MeitY, tasked with building a robust, self-reliant semiconductor and display manufacturing ecosystem in India.
UPSC context
GS Paper 3: Science & Technology. Tests knowledge of domestic electronics manufacturing, supply chain resilience, and Atmanirbhar Bharat policies.
I Am Shakti Udan Yojana
A flagship social welfare initiative of the Government of Rajasthan launched in December 2021 that distributes free sanitary napkins to girls and women, promoting menstrual health.
UPSC context
GS Paper 2: Social Justice. Tests knowledge of gender-sensitive state policies, maternal health indicators, and hygiene awareness campaigns.
CG Semi
A joint venture that established a ₹7,500 crore Outsourced Semiconductor Assembly and Test facility in Sanand, Gujarat, launching commercial production under the India Semiconductor Mission.
UPSC context
GS Paper 3: Science & Technology. Tests understanding of high-tech manufacturing, assembly-packaging-testing value chains, and investment models.
SJVN Limited
A Miniratna power sector Public Sector Undertaking that developed the 1,000 MW Bikaner Solar Energy Project in Rajasthan under the MNRE's CPSU Scheme.
UPSC context
GS Paper 3: Energy/Infrastructure. Tests awareness of India's 500 GW renewable target and the role of public undertakings in clean energy.
Hindustan Petroleum Corporation Limited (HPCL)
A Maharatna central public sector enterprise under the Ministry of Petroleum and Natural Gas, owning a 74% stake in the newly dedicated Pachpadra Refinery-cum-Petrochemical Complex.
UPSC context
GS Paper 3: Energy Infrastructure. Tests understanding of downstream petroleum refining capabilities and joint ventures for regional industrial growth.
Jaipur Metro Rail Corporation
A state-owned corporation in Rajasthan established to operate and expand the Jaipur Metro rapid transit system, currently executing the 41-km Phase 2 Orange Line.
UPSC context
GS Paper 3: Urban Infrastructure. Tests knowledge of mass transit systems, public transport planning, and joint venture infrastructure funding models.
Prelims Trap
The Modified UDAN Scheme continues to fund regional connectivity subsidies primarily via cross-subsidy levies charged to trunk-route domestic passengers.
Under the Modified UDAN Scheme (FY 2026-36), airline subsidies are directly funded through the central exchequer via VGF, completely removing the passenger levy mechanism used in the older UDAN phases.
Static Concepts Connected
What is the Nelson Complexity Index (NCI) in petroleum refining?
- Definition: A metric that measures the sophistication and secondary conversion capacity of an oil refinery relative to its basic crude distillation capacity.
- Significance: A higher NCI (like Pachpadra's 17.0) indicates a facility can process cheaper, heavy, high-sulfur (sour) crude oil into high-value lighter products.
- Economic impact: Highly complex refineries improve profit margins by maximizing yields of advanced petrochemical feedstocks over basic fuel oils.
What is the distinction between a Semiconductor Fab and an OSAT facility?
- Semiconductor Fab: A Fab is a highly capital-intensive front-end facility where microscopic circuits are printed onto silicon wafers in ultra-clean environments.
- OSAT Facility: OSAT (Outsourced Semiconductor Assembly and Test) is a back-end facility that packages, mounts, and rigorously tests the fabricated silicon dies.
- Value Chain: OSAT represents the final packaging phase, which requires less capital than Fabs but is critical for chip integration into electronics.
Cross-Topic Patterns
Aviation Reforms & Fiscal Policy
The transition of Modified UDAN's funding from passenger cross-subsidies to direct exchequer-backed Viability Gap Funding illustrates a structural shift toward state-led capital expenditure in infrastructure.
Semiconductor Diplomacy & Global Alliances
The Sanand OSAT joint venture involving Japanese and Thai firms showcases India's strategy to secure tech transfer and build resilient supply chains via Indo-Pacific diplomatic partnerships.
Modified UDAN's funding shift and the role of OSAT facilities under the Semiconductor Mission are highly probable 2026 Prelims topics.
Linked PYQs · 3
Linked PYQs · 3
- 2018RPSC_PRELIMSGS1
The proposed oil refinery in Pachpadra, Barmer, is a joint venture of which?
- 2021RPSC_PRELIMSGS1
'Green Energy Corridor' – Through which of the following districts will it pass in Rajasthan?
- 2023RPSC_PRELIMSGS1
Which agency has been given the responsibility of implementing the PM-KUSUM scheme (Component A) in Rajasthan, which involves the establishment of solar power plants with a capacity of 0.5 MW to 2 MW?